920-140 Exam
VoIP Multimedia Communication Server(MCS)5100 3.0
- Exam Number/Code : 920-140
- Exam Name : VoIP Multimedia Communication Server(MCS)5100 3.0
- Questions and Answers : 64 Q&As
- Update Time: 2011-10-24
- Testing Engine (SoftWare Version): $ 50.00
- PDF (Printable Version) Price: $15.00
Note: After purchase, we will send questions within 24 hours.
Free 920-140 Demo Download
Examsoon offers free demo for Other Nortel Certification 920-140 exam (VoIP Multimedia Communication Server(MCS)5100 3.0). You can check out the interface, question quality and usability of our practice exams before you decide to buy it. We are the only one site can offer demo for almost all products.
Download 920-140 ExamTesting Engine
Exam 920-140 Preparation from Examsoon include:
After you purchase our product, we will offer free update in time for 90 days.
100% Pass Guaranteed at First Attempt Or Free Update
Immediate Download After Purchase
Comprehensive questions with complete details
Questions accompanied by exhibits
Verified Answers Researched by Industry Experts
Drag and Drop questions as experienced in the Examsoon
Questions updated on regular basis
our product is in multiple-choice questions (MCQs)
Passing the Nortel 920-140 Exam:Passing the 920-140 exam has never been faster or easier, now with the questions and answers, without the messy 920-140 exam that are frequently incorrect. Examsoon Unlimited Access Exams are not only the cheaper way to pass without resorting to 920-140 tests, but at only $ 50.00 you get access to the exam from every certification vendor.
Our 920-140 practice exams and study questions are composed by current and active Information Technology experts, who use their experience in preparing you for your future in IT.
Nortel 920-140 Search Help Feel free to use search terms below while searching the Net for 920-140 exam:
920-140 brain dump simulations
920-140 Test question
920-140 braindump work
920-140 master exams
920-140 braindump model
920-140 latest test
Commitment to Your Success:
At Examsoon we are committed to you ongoing success. Our exams are constantly being updated and compared to industry standards.
You are not about to purchase a disposable product. 920-140 exam updates are supplied free of charge. Regardless of how soon you decide to take the 920-140 examination certification, you will be able to walk into the testing room as confident as the Certification Administrator.
Skip all the worthless 920-140 tutorials and download 920-140 exam materials with questions and answers and a price too unbelievable to pass up. Act now and download it today!
http://www.Examsoon.com The safer.easier way to get Other Nortel Certification Certification.
Exam : NORTEL 920-140
Title : VoIP Multimedia Communication Server(MCS)5100 3.0
1. During the verification of the Management / Accounting Module of a new MCS 5100 0 four-server system, you find that other systems are NOT accessible from the Management / Accounting Module. Which action will help you to identify and resolve the issue?
A. Verify that the /etc/defaultrouter file is empty and reboot the server.
B. Verify that the /etc/defaultrouter file contains the correct entry for the default gateway.
C. Verify that the /etc/defaultrouter file contains the IP address of the Management / Accounting Module in question.
D. Verify access from the Management / Accounting Module to the Terminal Server. If there is NO access, re-install the software on the server.
Answer: B
2. You are setting up the baseline MCS 5100 3.0 hardware platform according to the MCS 5100 baseline checklist requirements. After physically installing the Management/Accounting, Database, SIP Application and Web/IP Client Manager servers, how should the server serial ports be connected?
A. Each server must have one serial port connected to the MRV Terminal Server.
B. Each server must have one serial port connected to the Management Console.
C. Each server must have two serial ports connected to the MRV Terminal Server.
D. Each server must have one serial port connected to the Management Console, and one serial port connected to the MRV Terminal Server.
Answer: C
3. A customer is attempting to deploy and start the Sysmgr initial load on their new MCS 5100 3.0 system. When prompted to select a management load they chose the load name [mgmtsvr_all_ims_3.0_build1234] . But the installation was unsuccessful: an Out-of-Memory error was received. What could be the issue?
A. The amount of installed RAM is insufficient.
B. The size of the installed hard drive is insufficient.
C. The amount of configured virtual memory is insufficient.
D. The incorrect load was selected; select the load containing the word 'small'.
Answer: D
4. You are in the process of installing the SIP Application Module. All the required hardware has been installed and power on the server has been turned on. After accessing the SIP Application Module, what indication must you have before the software can be installed?
A. an >ok prompt is received on the console
B. that NO error logs are contained in the /tmp/install.log file
C. verification that the IP addressing of the Ethernet adapters is correct
D. that the Power On Self Test (POST) Light Emitting Diode (LED) illuminates
Answer: A
5. During the deployment of a four-server MCS 5100 3.0 system you have completed the installation of the System Management Console and have launched the System Management Console application. After successfully saving the license key, which components should be available by default?
A. the Sysmgr and a database instance
B. the Sysmgr and the Provisioning Module
C. the Database Module and the Accounting Module
D. the Application Module and the Accounting Module
Answer: A

